Phase II — Root Cause Analysis · Investigator: Rajesh Kumar

← Back to deviations

Phase II — Root Cause Analysis & Disposition

Confirm root cause, assess impact, and decide batch disposition.

  1. ✓Phase I
  2. 2Phase II
  3. 3CAPA
  4. 4Closure
  5. 5Complete

Describe specific evidence gathered (measurements, observations, test results)

Trace root cause to its source (optional but recommended)

Why 1:
Why 2:
Why 3:
Why 4:
Why 5:
out oftotal checks

Actions already completed to fix this occurrence

💡 RECOMMENDATION: CONDITIONAL RELEASE

Based on: Risk score 80/100, 1 OOS (14% of checks), yield 97.6%, MAJOR classification. Root cause identified, corrective action taken. CAPA required to prevent recurrence.

CAPA will be created with:
Linked Deviation:DEV-MET-0891-002
Root Cause:Equipment — calibration drift
Suggested Actions:
  1. Reduce Compression Machine A calibration interval to 20 days (from 30 days)
  2. Set Cpk alert if Fill Weight Cpk < 1.5
  3. Update SOP with new interval

Before closing Phase II, confirm:

← Back to Phase I