Computer System Validation
QsutraIPQA v1.0 — Validation Package
VALIDATION STATUS
System: QsutraIPQA v1.0
Facility: Stratogene Pharma Pvt. Ltd.
Status: ✅ VALIDATED
Valid from: 01 Mar 2026
Valid until: 28 Feb 2027
Next review: 28 Feb 2027
Validated by: Rajesh Kumar (QA Manager)
Approved by: Amit Patel (Production Supervisor)
📋
✅ APPROVEDValidation Master Plan
QST-VMP-001 · v1.0 · 01 Mar 2026
Defines the scope, strategy, responsibilities and schedule for validation of QsutraIPQA v1.0.
⚙️
✅ COMPLETEDInstallation Qualification
QST-IQ-001 · v1.0 · 15 Mar 2026
Documents that QsutraIPQA v1.0 is correctly installed and configured per manufacturer specifications.
🔬
✅ COMPLETEDOperational Qualification
QST-OQ-001 · v1.0 · 22 Mar 2026
Verifies that QsutraIPQA v1.0 operates as designed across all critical functions and workflows.
✅
✅ COMPLETEDPerformance Qualification
QST-PQ-001 · v1.0 · 01 Apr 2026
Confirms QsutraIPQA v1.0 performs consistently under actual production conditions.
📄
✅ APPROVEDCSV Summary Report
QST-CSV-001 · v1.0 · 15 Apr 2026
Consolidated validation summary for regulatory submission. Covers IQ, OQ and PQ conclusions.
Regulatory Basis
| 21 CFR Part 11 | Electronic Records & Electronic Signatures |
| 21 CFR Part 211 | Current GMP for Finished Pharmaceuticals |
| CDSCO Schedule M | GMP Requirements (2023) |
| EU GMP Annex 11 | Computerised Systems |
| GAMP 5 | Risk-Based Approach to Computerised Systems |
Change Control Register
| ID | Change | Date | Status |
|---|---|---|---|
| CC-001 | Initial Release | 01 Mar 2026 | ✅ Validated |
| CC-002 | Capsule Module | 01 May 2026 | ✅ Validated |
| CC-003 | Liquids Module | 01 Jun 2026 | ✅ Validated |