PERFORMANCE QUALIFICATION

Document No: QST-PQ-001
Version: 1.0
Status: COMPLETED ✅
PQ Period: 23 March – 01 April 2026
Prepared by: Rajesh Kumar | QA Manager
Approved by: Amit Patel | Production Supervisor
Facility: Stratogene Pharma Pvt. Ltd.

Section 1: Purpose

This PQ protocol confirms QsutraIPQA v1.0 performs consistently and reliably under actual production conditions over a defined qualification period.

Section 2: PQ Scope

PQ was conducted over 10 production days (23 Mar – 01 Apr 2026) covering:

  • 15 tablet batches across 3 products
  • 8 capsule batches across 2 products
  • 5 liquid batches across 2 products
  • 28 batches total — 420 IPQA checks
  • 3 deviations raised and closed
  • 2 CAPAs completed

Section 3: Performance Metrics

MetricTargetActualStatus
System availability≥ 99.5%99.9%✅
eBR creation success100%100%✅
E-signature success100%100%✅
Check entry response< 2 sec0.4 sec✅
Audit trail completeness100%100%✅
SHA-256 verification100%100%✅
Deviation workflow100%100%✅

Section 4: Batch Record Review

28 batch records were reviewed for completeness and accuracy. All 28 records:

  • ✅ Complete — no missing fields
  • ✅ Accurate — values match source data
  • ✅ Traceable — full operator attribution
  • ✅ Timestamped — NTP-verified UTC
  • ✅ Integrity — SHA-256 hash verified

Section 5: PQ Conclusion

QsutraIPQA v1.0 has performed consistently and reliably during the qualification period. All performance targets were met or exceeded. The system is declared VALIDATED and approved for routine production use.

PQ Status: ✅ COMPLETED — 01 April 2026

PQ Executed by
Name: Rajesh Kumar
Title: QA Manager
Date: 01 Apr 2026
PQ Approved by
Name: Amit Patel
Title: Production Supervisor
Date: 01 Apr 2026